ATHLETES VILLAGE BLOCK N14

by | Feb 22, 2022 | Balustrades, Metalworks, Portfolio, Secondary Structure, Structural Steel

Location: Stratford, London (circa. 2011)

Design Brief: Balustrades and Wintergarden Structure Design

CAD System: AutoCad

I had the pleasure of working with the design team on what would be the Athletes Village for the 2012 Olympics in London that would later become residential housing.

Photo Credit: Haworth Tompkins

A project that consisted of structural privacy screens and balcony balustrades, stair balustrades, rails, and a winter garden joining two adjacent blocks.

The winter garden structure was particularly interesting since the engineer had specific ideas around section use, and the fabricator chosen had limited experience with heavy sections. I was able to offer my expertise with heavy steel as this was the basis of my trade certification.

Photo Credit: Haworth Tompkins

Through the strategic application of heat and cutting methods I was able to demonstrate that it is entirely possible to cut down sections without warping or massive postprocessing treatment.

Having a strong practical grasp of heavy engineering meant that I was able to resolve and help complete this project to exactly what the engineer had envisioned.

Photo Credit: Haworth Tompkins

More From Our Portfolio

The Quadrant

Location: 10 Waterloo Quadrant, Auckland CBD, New Zealand (circa. 2005) Design Brief: 23 story building comprising over 250 hotel apartments CAD System: StruCad My role as the main design draughtsman was to detail the structural steel elements within our project...

Terminal 3 Heathrow

Location: Heathrow, London (circa. 2017)Design Brief: Walkway Balustrades, Internal Glass Partitioning, and Stair Structure DesignCAD System: AutoCad Advance Steel There are few places where your work will be viewed by tens of thousands on a day to day basis. Heathrow...

The Royal Opera House

Location: Covent Garden, London (circa. 2017)Design Brief: Entrance and Foyer MetalworkCAD System: AutoCad I’ve loved the Royal Opera House in Covent Garden since my wife and I visited in 2007 to watch ‘Swan Lake’ on the day of our engagement. I was further delighted...

Spirit of Cornwall – Chelsea Flower Show

Location: Chelsea Flower Show, London (circa. 2018)Design Brief: Spirit of Cornwall ExhibitionCAD System: AutoCad Advance Steel I was presented with a unique opportunity to be sole designer of the metalworks for the Spirit of Cornwall exhibit at the 2017 Chelsea...

IMPERIAL 2

Location: Bromley-by-Bow, London (circa. 2021) Design Brief: Balustrades - Block D comprised of 26 Stories & Block B comprised of 14 Stories CAD System: AutoCad Advance Steel Mid 2021 I was presented with a project in East London that covered 2 new residential...

Kiribati Marine Training Facility

Location: Kiribati, Gilbert Islands, Pacific Ocean (circa. 2006)Design Brief: New Build Structure, Walkways, Stairs and BalustradesCAD System: StruCad Quite often we are presented with projects on tight deadlines. This can be due to a variety of reasons, but how often...

WAITAKERE CIVIC CENTRE

Location: Henderson, Auckland NZ (circa. 2007) Design Brief: New Council Building Metalworks Package and Temporary Works CAD System: StruCad I had the opportunity to work on the handrails and balustrades scattered around what was to be the new Civic Centre for...

Kidbrooke Village

Location: Kidbrooke, London (circa. 2019)Design Brief: Phase 3 / Block D Metalwork PackageCAD System: AutoCad Advance Steel Kidbrooke is part of a broader residential redevelopment strategy undertaken by Berkeley Construction in South East London. For the Third Phase...

WE'RE HERE TO HELP YOU

Tell us what your project needs are today

Copyright © 2025 LEWIS HILLIER