Spirit of Cornwall – Chelsea Flower Show

by | Jan 26, 2022 | Metalworks, Portfolio

Location: Chelsea Flower Show, London (circa. 2018)
Design Brief: Spirit of Cornwall Exhibition
CAD System: AutoCad Advance Steel

I was presented with a unique opportunity to be sole designer of the metalworks for the Spirit of Cornwall exhibit at the 2017 Chelsea Flower Show.

The main structure was supported by a flat bar lattice frame on either side, together with walkway sections and fence panels, of the same theme.

The way that it had been visually designed by the architect, whatever fixing methods we used needed to be flush and near invisible to the eye. We couldn’t have any protruding bolt heads or threads which presented a challenge of how it should all be bolted together. Not only that, the exhibit needed to be deconstructed into multiple sections.

The solution was that the spacer tubes that run between the flat bar structure should be internally threaded and we would use a combination of countersunk bolts and threaded studs.

By strategically placing the tube spacers, we were able to form a structure that was demountable and moved to its permanent home in Cornwall after the show had ended.

During fabrication, the dish itself had to be spun by a specialist metalworks company, and when we received it, at first measure, it appeared to be within specs. But once the fabricator started putting all the pieces together things just weren’t matching up.

With the fabricator at a loss for what was wrong I had to go out into the workshop and figure out what was going on for myself. As it turned out that although the overall diameter of the dome was correct they had actually spun it to the wrong radius this meant that it was about 100mm too deep at the apex.

After some recalculating we came up with a method for joining all that back together without compromising the overall scheme of the dome piece.

There were a couple of interesting features incorporated into the design. The outlet for the waterfall needed to be precisely level, so I designed a tilting outlet.

Once the structure was installed and water was introduced into the feature whoever was installing had the ability to fine tune the water pour without needing to re-level the entire structure.

There was also the fear of the waterproofing of the feature leaking inside the dome. With all the shifting around it was a real concern.

We had to have a lifting eye in the centre of the dome whilst at the workshop to be able to lift and manoeuvre the structure during fabrication. My suggestion was to permanently weld the nut on the inside of the dome and to make a removable plug that could be periodically removed incase of water ingress.

Both are simple solutions that make a difference to the end product installation and future maintenance.

More From Our Portfolio

Terminal 3 Heathrow

Location: Heathrow, London (circa. 2017)Design Brief: Walkway Balustrades, Internal Glass Partitioning, and Stair Structure DesignCAD System: AutoCad Advance Steel There are few places where your work will be viewed by tens of thousands on a day to day basis. Heathrow...

The Quadrant

Location: 10 Waterloo Quadrant, Auckland CBD, New Zealand (circa. 2005) Design Brief: 23 story building comprising over 250 hotel apartments CAD System: StruCad My role as the main design draughtsman was to detail the structural steel elements within our project...

IMPERIAL 2

Location: Bromley-by-Bow, London (circa. 2021) Design Brief: Balustrades - Block D comprised of 26 Stories & Block B comprised of 14 Stories CAD System: AutoCad Advance Steel Mid 2021 I was presented with a project in East London that covered 2 new residential...

Kidbrooke Village

Location: Kidbrooke, London (circa. 2019)Design Brief: Phase 3 / Block D Metalwork PackageCAD System: AutoCad Advance Steel Kidbrooke is part of a broader residential redevelopment strategy undertaken by Berkeley Construction in South East London. For the Third Phase...

ATHLETES VILLAGE BLOCK N14

Location: Stratford, London (circa. 2011) Design Brief: Balustrades and Wintergarden Structure Design CAD System: AutoCad I had the pleasure of working with the design team on what would be the Athletes Village for the 2012 Olympics in London that would later become...

WAITAKERE CIVIC CENTRE

Location: Henderson, Auckland NZ (circa. 2007) Design Brief: New Council Building Metalworks Package and Temporary Works CAD System: StruCad I had the opportunity to work on the handrails and balustrades scattered around what was to be the new Civic Centre for...

The Royal Opera House

Location: Covent Garden, London (circa. 2017)Design Brief: Entrance and Foyer MetalworkCAD System: AutoCad I’ve loved the Royal Opera House in Covent Garden since my wife and I visited in 2007 to watch ‘Swan Lake’ on the day of our engagement. I was further delighted...

Kiribati Marine Training Facility

Location: Kiribati, Gilbert Islands, Pacific Ocean (circa. 2006)Design Brief: New Build Structure, Walkways, Stairs and BalustradesCAD System: StruCad Quite often we are presented with projects on tight deadlines. This can be due to a variety of reasons, but how often...

WE'RE HERE TO HELP YOU

Tell us what your project needs are today

Copyright © 2025 LEWIS HILLIER