IMPERIAL 2

by | Feb 22, 2022 | Balustrades, Metalworks, Portfolio

Location: Bromley-by-Bow, London (circa. 2021)

Design Brief: Balustrades – Block D comprised of 26 Stories & Block B comprised of 14 Stories

CAD System: AutoCad Advance Steel

Mid 2021 I was presented with a project in East London that covered 2 new residential tower blocks. One 14 stories tall, and the other, a commanding 26 stories. The brief was fairly straightforward – come up with a system that could make the fabrication and installation as efficient as possible whilst maintaining the architect’s design aesthetic.

This reminded me of a project I had worked on many years earlier while still in New Zealand. The infill bars weren’t completely welded, instead they were drilled and captivated within the outer frame. The only issue here was that we weren’t using a round bar or tube, we were using flat bars. 

The result was a plasma cut top and bottom rail with just enough clearance to allow the flat bar infills to be inserted and welded from behind. Welding distortion and grinding were kept to a minimum which really helped to speed production.

The other issue was installation: how do you account for early production while still ensuring the balustrades are going to fit? The answer was a unique first fix bracket system that once installed would make allowance of up to 25mm of variance in the concrete structure.

By also making these universal I was able to reduce fabrication set up as well as logistics. If the site teams don’t have to find a particular bracket then they really only need to make sure they have the right quantities delivered at any given time.

So it was with this idea that I was able to help deliver 830m of complete design balustrades in a matter of weeks rather than the originally anticipated months.

More From Our Portfolio

ATHLETES VILLAGE BLOCK N14

Location: Stratford, London (circa. 2011) Design Brief: Balustrades and Wintergarden Structure Design CAD System: AutoCad I had the pleasure of working with the design team on what would be the Athletes Village for the 2012 Olympics in London that would later become...

Kidbrooke Village

Location: Kidbrooke, London (circa. 2019)Design Brief: Phase 3 / Block D Metalwork PackageCAD System: AutoCad Advance Steel Kidbrooke is part of a broader residential redevelopment strategy undertaken by Berkeley Construction in South East London. For the Third Phase...

Kiribati Marine Training Facility

Location: Kiribati, Gilbert Islands, Pacific Ocean (circa. 2006)Design Brief: New Build Structure, Walkways, Stairs and BalustradesCAD System: StruCad Quite often we are presented with projects on tight deadlines. This can be due to a variety of reasons, but how often...

Spirit of Cornwall – Chelsea Flower Show

Location: Chelsea Flower Show, London (circa. 2018)Design Brief: Spirit of Cornwall ExhibitionCAD System: AutoCad Advance Steel I was presented with a unique opportunity to be sole designer of the metalworks for the Spirit of Cornwall exhibit at the 2017 Chelsea...

The Royal Opera House

Location: Covent Garden, London (circa. 2017)Design Brief: Entrance and Foyer MetalworkCAD System: AutoCad I’ve loved the Royal Opera House in Covent Garden since my wife and I visited in 2007 to watch ‘Swan Lake’ on the day of our engagement. I was further delighted...

The Quadrant

Location: 10 Waterloo Quadrant, Auckland CBD, New Zealand (circa. 2005) Design Brief: 23 story building comprising over 250 hotel apartments CAD System: StruCad My role as the main design draughtsman was to detail the structural steel elements within our project...

Terminal 3 Heathrow

Location: Heathrow, London (circa. 2017)Design Brief: Walkway Balustrades, Internal Glass Partitioning, and Stair Structure DesignCAD System: AutoCad Advance Steel There are few places where your work will be viewed by tens of thousands on a day to day basis. Heathrow...

WAITAKERE CIVIC CENTRE

Location: Henderson, Auckland NZ (circa. 2007) Design Brief: New Council Building Metalworks Package and Temporary Works CAD System: StruCad I had the opportunity to work on the handrails and balustrades scattered around what was to be the new Civic Centre for...

WE'RE HERE TO HELP YOU

Tell us what your project needs are today

Copyright © 2025 LEWIS HILLIER