WAITAKERE CIVIC CENTRE

by | Feb 22, 2022 | Balustrades, Metalworks, Portfolio

Location: Henderson, Auckland NZ (circa. 2007)

Design Brief: New Council Building Metalworks Package and Temporary Works

CAD System: StruCad

I had the opportunity to work on the handrails and balustrades scattered around what was to be the new Civic Centre for Waitakere City. An audacious concept for a public building it would also become the transport hub for the wider city.

Photo Credit: Arch Daily


One particular feature I enjoyed was the Link Bridge across the main TransRail tracks. This required a temporary works form to straddle the rail tracks so that the reinforced concrete could be placed and poured without disruption to rail traffic.

With millimetre precision and a 4 hour time slot the site team were able to install the framework without incident.

Although destined to be removed I was always proud of the structure designed for a quick installation without fuss.

More From Our Portfolio

Terminal 3 Heathrow

Location: Heathrow, London (circa. 2017)Design Brief: Walkway Balustrades, Internal Glass Partitioning, and Stair Structure DesignCAD System: AutoCad Advance Steel There are few places where your work will be viewed by tens of thousands on a day to day basis. Heathrow...

Kidbrooke Village

Location: Kidbrooke, London (circa. 2019)Design Brief: Phase 3 / Block D Metalwork PackageCAD System: AutoCad Advance Steel Kidbrooke is part of a broader residential redevelopment strategy undertaken by Berkeley Construction in South East London. For the Third Phase...

IMPERIAL 2

Location: Bromley-by-Bow, London (circa. 2021) Design Brief: Balustrades - Block D comprised of 26 Stories & Block B comprised of 14 Stories CAD System: AutoCad Advance Steel Mid 2021 I was presented with a project in East London that covered 2 new residential...

Kiribati Marine Training Facility

Location: Kiribati, Gilbert Islands, Pacific Ocean (circa. 2006)Design Brief: New Build Structure, Walkways, Stairs and BalustradesCAD System: StruCad Quite often we are presented with projects on tight deadlines. This can be due to a variety of reasons, but how often...

The Royal Opera House

Location: Covent Garden, London (circa. 2017)Design Brief: Entrance and Foyer MetalworkCAD System: AutoCad I’ve loved the Royal Opera House in Covent Garden since my wife and I visited in 2007 to watch ‘Swan Lake’ on the day of our engagement. I was further delighted...

Spirit of Cornwall – Chelsea Flower Show

Location: Chelsea Flower Show, London (circa. 2018)Design Brief: Spirit of Cornwall ExhibitionCAD System: AutoCad Advance Steel I was presented with a unique opportunity to be sole designer of the metalworks for the Spirit of Cornwall exhibit at the 2017 Chelsea...

ATHLETES VILLAGE BLOCK N14

Location: Stratford, London (circa. 2011) Design Brief: Balustrades and Wintergarden Structure Design CAD System: AutoCad I had the pleasure of working with the design team on what would be the Athletes Village for the 2012 Olympics in London that would later become...

The Quadrant

Location: 10 Waterloo Quadrant, Auckland CBD, New Zealand (circa. 2005) Design Brief: 23 story building comprising over 250 hotel apartments CAD System: StruCad My role as the main design draughtsman was to detail the structural steel elements within our project...

£7.5 MILLION

Specialist fabrication design delivered across a live project portfolio over two years.

That’s what the right expertise in the right place actually looks like.

Lewis Hillier is part of the TIWICO family — a collaborative consultancy bringing together specialist expertise across design and fabrication.

Contact Me

 +447497029147

[email protected]

Copyright © TIWICO LTD 2026 all rights reserved | TIWICO Ltd is registered in England and Wales. Company Registration No.16350225.